nav-left cat-right
cat-right

Turbinators selected for existing facility in the US

Turbinators selected for existing facility in the US
EBD Hydro LLC is to install three 1000kW Turbinators from Norway's CleanPower AS as part of a low head hydropower project being developed on an existing irrigation canal in Oregon, US. In a statement, EBD Hydro said it contracted with CleanPower AS in …
Read more on International Water Power and Dam Construction

468 ad